|
Central Washington University - Ellensburg, Washington
This project included fire alarm and security upgrade at several campus buildings.
Mountain View High School - Bend, Oregon
North Bend Elementary School - Bend, Oregon
South Bend Elementary School - Bend, Oregon
Lapine Elementary School - Lapine, Oregon
Bend Middle School - Bend, Oregon
Each of these projects included the integration of a telephone switch into a school intercom system to allow the teacher in the classroom to make out going calls as well as using the intercom function for calling the office, councilors, and other classrooms. The systems are integrated into the media retrieval system at the media centers to call-up specific programs on the class rooms television receivers. By pressing the telephone hand set numbers, any of three VCR’s or a laser disk player can be displayed on the classroom TV’s. The hand set can also be used to fast forward, rewind, play, and pause the media. The system was designed to allow presentations of live and pre-recorded media. Live presentations are produced with the use of a video camera with microphone plugged into any television outlet within the facility or gym areas. The signals are then back-fed up to the system head-end for either recording or live distribution. Initially the systems were designed for Off-Air reception, but the layout and frequency selections were designed to facilitate ease of connection to cable and/or satellite TV systems.
Other systems included are security and access control systems and fire systems. The security systems are integrated into the access control systems to facilitate ease of operation and maintenance and minimize costs. Access control is used to limit access to the computer labs and other sensitive areas within the facilities. The access control system is used to monitor all perimeter doors selected windows and motion detection located throughout the facility.
Green Hill School, Juvenile Detention Facility (1999) - Washington
This $30 million project included the replacement of all existing housing buildings and provision of a new middle/high school, admin. building, laundry and shop buildings. Systems included custom control panels for staff stations and the Central Control Room, integrated door control, intercom and paging, CCTV, access control and fire alarm systems.
Other systems included a CATV distribution system integrated with a new media center for distribution of live and prerecorded media over the TV system.
|